Graphite Creek Mine

A truck and shovel operation with four active mining areas is projected for the mine based on the PEA.  Company owned and operated equipment is assumed mining about 4 million tonnes of material through 360 days each year, once full production is reached in Year 6.  About 1 million tonnes of this would be graphite mineralization with an average grade of 7% Cg delivered to the Processing Plant.  Key mine equipment and facilities planned include:

  • 4 excavators, 8 rear dump trucks and accompanying support equipment
  • 22-mile access road connecting the mine and processing plant to the Nome-Teller highway
  • Three 2MW diesel fueled power generators
  • Power distribution system
  • Tailings facility
  • Water and sewage treatment facilities
  • Maintenance, storage and administration facilities